My septic system has failed. What do I do?
Contact a design engineer who will design a new septic system based on the total number of bedrooms for residential properties. The design of the septic system is a multi-step process that usually involves a survey of your property, a soil and percolation test, and a sketch of your house floor plan all of which can take up to two to three months depending on your engineer’s schedule, the backlog of scheduled soil tests, and the review of the final septic plan by the Health Department. The Health Department is available to guide you through this process.

Health Department

Show All Answers

1. What is Title V?
2. My septic system has failed. What do I do?
3. How often should I pump my septic system?
4. I am selling my house. What is required?
5. I want to add a bedroom / addition to my house. What is requried?
6. I wish to landscape my yard. What do I need to know?
7. Is there a Tax Credit available for septic system installations?
8. Is there money available for septic pumping and/or replacement of my septic system?